Hangzhou Olympic Sports Center Stadium - 4K stock video

The construction area is 229,000 square meters (including 61,000 square meters of underground construction area). There are 80,000 auditoriums divided into upper, middle and lower floors, and the stands are disconnected on the north side. The purpose is to facilitate the heat dissipation in the stadium and the audience to watch the scenery of Qiantang River. The exterior design concept draws on the concept of silk texture and dynamic Qiantang River water. The exterior is a steel structure with 28 large petals and 27 small petals. On November 28, 2013, the steel structure was officially closed.
The construction area is 229,000 square meters (including 61,000 square meters of underground construction area). There are 80,000 auditoriums divided into upper, middle and lower floors, and the stands are disconnected on the north side. The purpose is to facilitate the heat dissipation in the stadium and the audience to watch the scenery of Qiantang River. The exterior design concept draws on the concept of silk texture and dynamic Qiantang River water. The exterior is a steel structure with 28 large petals and 27 small petals. On November 28, 2013, the steel structure was officially closed.
PURCHASE A LICENCE

Get personalised pricing by telling us when, where, and how you want to use this asset.

Not sure if you can use this video for commercial purposes? Find out

DETAILS

Creative #:
1355643891
Licence type:
Rights-ready
Collection:
Moment Video RR
Max file size:
3840 x 2160 px - 452 MB
Clip length:
00:00:36:21
Upload date:
Location:
hangzhou, zhejiang, China
Intended for:
Editorial use
Release info:
Not released
Mastered to:
QuickTime HEVC 4K 3840x2160 29.97p