Construction Begins On Controlled Thermal Resources Lithium Valley Campus In California

NILAND, CA - FEBRUARY 15: In an aerial view, steam emanates from Controlled Thermal Resources' Hell's Kitchen lithium and renewable power plant, the first of several to be built despite the threat of a lawsuit to stall or stop it on February 15, 2024 near Niland, California. Geothermal plants create steam power from boiling, mineral-rich brine drawn from deep under geothermal fields. A race is on to develop processing to separate raw lithium out of the waste stream to be used in the production of batteries for electric vehicles. This geothermal field at the eastern edge of the Salton Sea has is being called the future "Lithium Valley", with the potential to extract 18 million metric tons of lithium from this geothermal field, roughly the equivalent of 382 million electric vehicle batteries, according to a report by the Lawrence Berkeley National Laboratory. The area is believed to have the world's highest concentration of lithium contained in geothermal brines. (Photo by David McNew/Getty Images)
NILAND, CA - FEBRUARY 15: In an aerial view, steam emanates from Controlled Thermal Resources' Hell's Kitchen lithium and renewable power plant, the first of several to be built despite the threat of a lawsuit to stall or stop it on February 15, 2024 near Niland, California. Geothermal plants create steam power from boiling, mineral-rich brine drawn from deep under geothermal fields. A race is on to develop processing to separate raw lithium out of the waste stream to be used in the production of batteries for electric vehicles. This geothermal field at the eastern edge of the Salton Sea has is being called the future "Lithium Valley", with the potential to extract 18 million metric tons of lithium from this geothermal field, roughly the equivalent of 382 million electric vehicle batteries, according to a report by the Lawrence Berkeley National Laboratory. The area is believed to have the world's highest concentration of lithium contained in geothermal brines. (Photo by David McNew/Getty Images)
Construction Begins On Controlled Thermal Resources Lithium Valley Campus In California
PURCHASE A LICENCE
How can I use this image?
£275.00
GBP
Getty ImagesConstruction Begins On Controlled Thermal Resources Lithium Valley..., News PhotoConstruction Begins On Controlled Thermal Resources Lithium Valley..., News PhotoConstruction Begins On Controlled Thermal Resources Lithium Valley... Get premium, high resolution news photos at Getty ImagesProduct #:2008851065
£375£150
Getty Images
In stock

DETAILS

Restrictions:
Contact your local office for all commercial or promotional uses.
Credit:
David McNew / Contributor
Editorial #:
2008851065
Collection:
Getty Images News
Date created:
15 February, 2024
Upload date:
Licence type:
Release info:
Not released. More information
Source:
Getty Images North America
Object name:
US-
Max file size:
5000 x 3744 px (42.33 x 31.70 cm) - 300 dpi - 9 MB